OCOTILLO EXPRESS (493)

OCOTILLO EXPRESS is a 265.4 MW wind interconnection project in Imperial, California with a current status of active. It is proposed to connect at Ocotillo Switchyard 500 kV .

265.4 MWCapacity
ActiveStatus
—Market
WindTechnology

Project facts

Canonical nameOCOTILLO EXPRESS
Queue ID493
Statusactive
Source statusACTIVE
Market—
TechnologyWind
Capacity265.4 MW
StateCalifornia
CountyImperial
Point of interconnectionOcotillo Switchyard 500 kV
Requested (queue) date2009-07-31
Proposed in-service date—
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerSDGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—activehigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata