Offshore Wind CNR only (1500)

Offshore Wind CNR only is a 1,249.5 MW wind interconnection project with a current status of withdrawn. It is proposed to connect at National Grid Brayton Point 345kV Substation.

1,249.5 MWCapacity
WithdrawnStatus
RIMarket
WindTechnology

Project facts

Canonical nameOffshore Wind CNR only
Queue ID1500
Statuswithdrawn
Source statusW
MarketRI
TechnologyWind
Capacity1,249.5 MW
StateMassachusetts
County—
Point of interconnectionNational Grid Brayton Point 345kV Substation
Requested (queue) date2024-02-20
Proposed in-service date2033-11-04
Operational date—
Withdrawn date2025-10-11
Developer—
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—withdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-11-26

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.