(Offshore wind Increase (Q700 +Q1154) (1356)

(Offshore wind Increase (Q700 +Q1154) is a 38.8 MW wind interconnection project with a current status of withdrawn. It is proposed to connect at Eversource 345kV West Barnstable (921).

38.8 MWCapacity
WithdrawnStatus
SEMAMarket
WindTechnology

Project facts

Canonical name(Offshore wind Increase (Q700 +Q1154)
Queue ID1356
Statuswithdrawn
Source statusW
MarketSEMA
TechnologyWind
Capacity38.8 MW
StateMassachusetts
County
Point of interconnectionEversource 345kV West Barnstable (921)
Requested (queue) date2023-02-09
Proposed in-service date2026-10-30
Operational date
Withdrawn date2024-10-14
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata