Offshore Wind (1059)

Offshore Wind is a 1,200.0 MW wind interconnection project with a current status of withdrawn. It is proposed to connect at Eversource NSTAR Pilgrim 345 kV substation.

1,200.0 MWCapacity
WithdrawnStatus
SEMAMarket
WindTechnology

Project facts

Canonical nameOffshore Wind
Queue ID1059
Statuswithdrawn
Source statusW
MarketSEMA
TechnologyWind
Capacity1,200.0 MW
StateMassachusetts
County
Point of interconnectionEversource NSTAR Pilgrim 345 kV substation
Requested (queue) date2020-09-09
Proposed in-service date2027-11-30
Operational date
Withdrawn date2022-12-13
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata