Offshore Wind (927)

Offshore Wind is a 1,200.0 MW wind interconnection project with a current status of withdrawn. It is proposed to connect at Primary: Eversource (CL&P) 345kV Montville, Alternatively Eversource (CL&P) 345kV Millstone..

1,200.0 MWCapacity
WithdrawnStatus
CTMarket
WindTechnology

Project facts

Canonical nameOffshore Wind
Queue ID927
Statuswithdrawn
Source statusW
MarketCT
TechnologyWind
Capacity1,200.0 MW
StateConnecticut
County
Point of interconnectionPrimary: Eversource (CL&P) 345kV Montville, Alternatively Eversource (CL&P) 345kV Millstone.
Requested (queue) date2019-09-16
Proposed in-service date2031-05-31
Operational date
Withdrawn date2024-08-07
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata