Oklaunion-Tuco 345kV Line Break (GEN-2022-242)

Oklaunion-Tuco 345kV Line Break is a 250.0 MW battery interconnection project in Ford And Wilbarger, Texas with a current status of withdrawn. It is proposed to connect at Oklaunion-Tuco 345kV Line Break.

250.0 MWCapacity
WithdrawnStatus
TXMarket
BatteryTechnology

Project facts

Canonical nameOklaunion-Tuco 345kV Line Break
Queue IDGEN-2022-242
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologyBattery
Capacity250.0 MW
StateTexas
CountyFord And Wilbarger
Point of interconnectionOklaunion-Tuco 345kV Line Break
Requested (queue) date2023-03-10
Proposed in-service date2027-12-15
Operational date
Withdrawn date2023-11-06
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata