Old Alma Road Solar is a 20.1 MW solar interconnection project in Ellis, Texas with a current status of active. It is proposed to connect at 2326 ENNS_SE_8 138kV.
20.1 MWCapacity
ActiveStatus
EllisMarket
SolarTechnology
Project facts
| Canonical name | Old Alma Road Solar |
|---|---|
| Queue ID | 28INR0495 |
| Status | active |
| Source status | SS Started, FIS Started, No IA |
| Market | Ellis |
| Technology | Solar |
| Capacity | 20.1 MW |
| State | Texas |
| County | Ellis |
| Point of interconnection | 2326 ENNS_SE_8 138kV |
| Requested (queue) date | 2026-09-04 |
| Proposed in-service date | 2028-10-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Wildcat Renewables, LLC |
| Utility / transmission owner | ERCOT |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-10-30 | new_project | — | active | high |
Explore related data
Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-26
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata