Old Aqueduct Batt is a 302.9 MW other interconnection project in Hale, Texas with a current status of operational. It is proposed to connect at 23920 Blackwater 345kV .

302.9 MWCapacity
OperationalStatus
HaleMarket
OtherTechnology

Project facts

Canonical nameOld Aqueduct Batt
Queue ID22INR0330
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketHale
TechnologyOther
Capacity302.9 MW
StateTexas
CountyHale
Point of interconnection23920 Blackwater 345kV
Requested (queue) date2020-05-01
Proposed in-service date
Operational date2028-06-01
Withdrawn date
DeveloperOld Aqueduct Solar
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.