Old Settler Wind (60366_OSWF)

Old Settler Wind is a 151.2 MW wind interconnection project in Floyd, Texas with a current status of operational.

151.2 MWCapacity
OperationalStatus
ERCOMarket
WindTechnology

Project facts

Canonical nameOld Settler Wind
Queue ID60366_OSWF
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyWind
Capacity151.2 MW
StateTexas
CountyFloyd
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2017-04-01
Withdrawn date
Developer
Utility / transmission ownerOld Settler Wind, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata