Olive-Meadow Lake 345kV (Y2-010)

Olive-Meadow Lake 345kV is a 100.0 MW wind interconnection project in White, Indiana with a current status of withdrawn.

100.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameOlive-Meadow Lake 345kV
Queue IDY2-010
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity100.0 MW
StateIndiana
CountyWhite
Point of interconnection
Requested (queue) date2012-05-23
Proposed in-service date2015-12-31
Operational date
Withdrawn date2014-02-06
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata