Olive-Reynolds 345 #1 345 kV (AG2-116 - moved to TC2)

Olive-Reynolds 345 #1 345 kV is a 100.0 MW solar interconnection project in White, Indiana with a current status of withdrawn.

100.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameOlive-Reynolds 345 #1 345 kV
Queue IDAG2-116 - moved to TC2
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity100.0 MW
StateIndiana
CountyWhite
Point of interconnection
Requested (queue) date2021-01-29
Proposed in-service date2023-10-31
Operational date
Withdrawn date2025-07-03
Developer
Utility / transmission ownerAEP

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata