Olive - Reynolds 345 kV (AH2-233)

Olive - Reynolds 345 kV is a 100.0 MW battery interconnection project in Pulaski, Indiana with a current status of withdrawn.

100.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology

Project facts

Canonical nameOlive - Reynolds 345 kV
Queue IDAH2-233
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyBattery
Capacity100.0 MW
StateIndiana
CountyPulaski
Point of interconnection—
Requested (queue) date2022-03-09
Proposed in-service date2026-12-31
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata