Olive-University Park 345 kV (AG1-448)

Olive-University Park 345 kV is a 55.0 MW battery interconnection project in LaPorte, Indiana with a current status of withdrawn.

55.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology

Project facts

Canonical nameOlive-University Park 345 kV
Queue IDAG1-448
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyBattery
Capacity55.0 MW
StateIndiana
CountyLaPorte
Point of interconnection—
Requested (queue) date2020-09-30
Proposed in-service date2023-12-31
Operational date—
Withdrawn date2022-01-27
Developer—
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata