Oliver Dam (720_3)

Oliver Dam is a 18.0 MW other interconnection project in Muscogee, Georgia with a current status of operational.

18.0 MWCapacity
OperationalStatus
SOCOMarket
OtherTechnology

Project facts

Canonical nameOliver Dam
Queue ID720_3
Statusoperational
Source status(OP) Operating
MarketSOCO
TechnologyOther
Capacity18.0 MW
StateGeorgia
CountyMuscogee
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1959-08-01
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata