Oliver Wind IV (67502_GEN4)

Oliver Wind IV is a 198.8 MW wind interconnection project in Oliver, North Dakota with a current status of operational.

198.8 MWCapacity
OperationalStatus
SWPPMarket
WindTechnology

Project facts

Canonical nameOliver Wind IV
Queue ID67502_GEN4
Statusoperational
Source status(OP) Operating
MarketSWPP
TechnologyWind
Capacity198.8 MW
StateNorth Dakota
CountyOliver
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2024-12-01
Withdrawn date
Developer
Utility / transmission ownerOliver Wind IV, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata