On proposed Big Stone-Ellendale 345 kV line approx. 76 miles west of Big Stone (J458)
On proposed Big Stone-Ellendale 345 kV line approx. 76 miles west of Big Stone is a 200.0 MW wind interconnection project in Clark County, South Dakota with a current status of withdrawn. It is proposed to connect at On proposed Big Stone-Ellendale 345 kV line approx. 76 miles west of Big Stone.
Project facts
| Canonical name | On proposed Big Stone-Ellendale 345 kV line approx. 76 miles west of Big Stone |
|---|---|
| Queue ID | J458 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Wind |
| Capacity | 200.0 MW |
| State | South Dakota |
| County | Clark County |
| Point of interconnection | On proposed Big Stone-Ellendale 345 kV line approx. 76 miles west of Big Stone |
| Requested (queue) date | 2015-05-18 |
| Proposed in-service date | 2019-09-30 |
| Operational date | 2019-09-30 |
| Withdrawn date | 2019-04-09 |
| Developer | — |
| Utility / transmission owner | Otter Tail Power Company |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.