Oney 138kV substation (GEN-2018-098)

Oney 138kV substation is a 40.0 MW battery interconnection project in Caddo, Oklahoma with a current status of withdrawn. It is proposed to connect at Oney 138kV substation.

40.0 MWCapacity
WithdrawnStatus
OKMarket
BatteryTechnology

Project facts

Canonical nameOney 138kV substation
Queue IDGEN-2018-098
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologyBattery
Capacity40.0 MW
StateOklahoma
CountyCaddo
Point of interconnectionOney 138kV substation
Requested (queue) date2018-11-21
Proposed in-service date
Operational date
Withdrawn date2022-05-04
Developer
Utility / transmission ownerWFEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata