OR Queue Project 26-007 — Battery in Clackamas, Oregon
OR Queue Project 26-007 — Battery in Clackamas, Oregon is a 150.0 MW battery interconnection project in Clackamas, Oregon with a current status of active. It is proposed to connect at Carver Substation 115kV.
150.0 MWCapacity
ActiveStatus
ORMarket
BatteryTechnology
Project facts
| Canonical name | OR Queue Project 26-007 — Battery in Clackamas, Oregon |
|---|---|
| Queue ID | 26-007 |
| Status | active |
| Source status | 2026 Cluster Study |
| Market | OR |
| Technology | Battery |
| Capacity | 150.0 MW |
| State | Oregon |
| County | Clackamas |
| Point of interconnection | Carver Substation 115kV |
| Requested (queue) date | — |
| Proposed in-service date | 2029-12-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Portland General Electric |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-05 | new_project | — | active | high |
Explore related data
Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-27
Provenance: pge-or-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata