OR Queue Project 536 — Solar+Battery in Malheur, Oregon

OR Queue Project 536 — Solar+Battery in Malheur, Oregon is a 23.0 MW solar+battery interconnection project in Malheur, Oregon with a current status of withdrawn. It is proposed to connect at Hope Junction - Harper Junction 69kV Line.

23.0 MWCapacity
WithdrawnStatus
ORMarket
Solar+BatteryTechnology

Project facts

Canonical nameOR Queue Project 536 — Solar+Battery in Malheur, Oregon
Queue ID536
Statuswithdrawn
Source statusWithdrawn
MarketOR
TechnologySolar+Battery
Capacity23.0 MW
StateOregon
CountyMalheur
Point of interconnectionHope Junction - Harper Junction 69kV Line
Requested (queue) date2018-06-25
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerIdaho Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: idahopower-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.