OR Queue Project 664 — Solar+Battery in Malheur, Oregon
OR Queue Project 664 — Solar+Battery in Malheur, Oregon is a 2.0 MW solar+battery interconnection project in Malheur, Oregon with a current status of withdrawn. It is proposed to connect at Distribution Feeder.
2.0 MWCapacity
WithdrawnStatus
ORMarket
Solar+BatteryTechnology
Project facts
| Canonical name | OR Queue Project 664 — Solar+Battery in Malheur, Oregon |
|---|---|
| Queue ID | 664 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | OR |
| Technology | Solar+Battery |
| Capacity | 2.0 MW |
| State | Oregon |
| County | Malheur |
| Point of interconnection | Distribution Feeder |
| Requested (queue) date | 2022-06-29 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Idaho Power Company |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: idahopower-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata