OR Queue Project 690 — Solar+Battery in Morrow;#umatilla, Oregon
OR Queue Project 690 — Solar+Battery in Morrow;#umatilla, Oregon is a 329.0 MW solar+battery interconnection project in Morrow;#umatilla, Oregon with a current status of withdrawn. It is proposed to connect at Boardman–Hemingway 500kV Line.
329.0 MWCapacity
WithdrawnStatus
ORMarket
Solar+BatteryTechnology
Project facts
| Canonical name | OR Queue Project 690 — Solar+Battery in Morrow;#umatilla, Oregon |
|---|---|
| Queue ID | 690 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | OR |
| Technology | Solar+Battery |
| Capacity | 329.0 MW |
| State | Oregon |
| County | Morrow;#umatilla |
| Point of interconnection | Boardman–Hemingway 500kV Line |
| Requested (queue) date | 2022-12-14 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Idaho Power Company |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: idahopower-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.