OR Queue Project 690 — Solar+Battery in Morrow;#umatilla, Oregon

OR Queue Project 690 — Solar+Battery in Morrow;#umatilla, Oregon is a 329.0 MW solar+battery interconnection project in Morrow;#umatilla, Oregon with a current status of withdrawn. It is proposed to connect at Boardman–Hemingway 500kV Line.

329.0 MWCapacity
WithdrawnStatus
ORMarket
Solar+BatteryTechnology

Project facts

Canonical nameOR Queue Project 690 — Solar+Battery in Morrow;#umatilla, Oregon
Queue ID690
Statuswithdrawn
Source statusWithdrawn
MarketOR
TechnologySolar+Battery
Capacity329.0 MW
StateOregon
CountyMorrow;#umatilla
Point of interconnectionBoardman–Hemingway 500kV Line
Requested (queue) date2022-12-14
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerIdaho Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: idahopower-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata