OR Queue Project G0389 — Wind in Morrow, Oregon

OR Queue Project G0389 — Wind in Morrow, Oregon is a 207.0 MW wind interconnection project in Morrow, Oregon with a current status of withdrawn. It is proposed to connect at New Substation near McNary 500 kV.

207.0 MWCapacity
WithdrawnStatus
ORMarket
WindTechnology

Project facts

Canonical nameOR Queue Project G0389 — Wind in Morrow, Oregon
Queue IDG0389
Statuswithdrawn
Source statusWITHDRAWN
MarketOR
TechnologyWind
Capacity207.0 MW
StateOregon
CountyMorrow
Point of interconnectionNew Substation near McNary 500 kV
Requested (queue) date2009-11-02
Proposed in-service date2013-11-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata