OR Queue Project G0391 — Wind in Gilliam, Oregon

OR Queue Project G0391 — Wind in Gilliam, Oregon is a 425.0 MW wind interconnection project in Gilliam, Oregon with a current status of withdrawn. It is proposed to connect at BPA’s Transmission Facilities on the Slatt-Buckley or Ashe-Marion transmission lines approx. 9 miles SW of Slatt.

425.0 MWCapacity
WithdrawnStatus
ORMarket
WindTechnology

Project facts

Canonical nameOR Queue Project G0391 — Wind in Gilliam, Oregon
Queue IDG0391
Statuswithdrawn
Source statusWITHDRAWN
MarketOR
TechnologyWind
Capacity425.0 MW
StateOregon
CountyGilliam
Point of interconnectionBPA’s Transmission Facilities on the Slatt-Buckley or Ashe-Marion transmission lines approx. 9 miles SW of Slatt
Requested (queue) date2009-11-03
Proposed in-service date2013-03-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata