OR Queue Project G0410 — Solar in Lake, Oregon
OR Queue Project G0410 — Solar in Lake, Oregon is a 5.0 MW solar interconnection project in Lake, Oregon with a current status of withdrawn. It is proposed to connect at TO THE MIDSTATE ELECTRIC 24.9 KV DISTRIBUTION SYSTEM ON THE WEST BORDER OF THE PROPERTY, ALONG FOSSIL LAKE ROAD..
5.0 MWCapacity
WithdrawnStatus
ORMarket
SolarTechnology
Project facts
| Canonical name | OR Queue Project G0410 — Solar in Lake, Oregon |
|---|---|
| Queue ID | G0410 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | OR |
| Technology | Solar |
| Capacity | 5.0 MW |
| State | Oregon |
| County | Lake |
| Point of interconnection | TO THE MIDSTATE ELECTRIC 24.9 KV DISTRIBUTION SYSTEM ON THE WEST BORDER OF THE PROPERTY, ALONG FOSSIL LAKE ROAD. |
| Requested (queue) date | 2010-02-26 |
| Proposed in-service date | 2010-12-07 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Bonneville Power Administration |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata