OR Queue Project G0416 — Solar in Lake, Oregon

OR Queue Project G0416 — Solar in Lake, Oregon is a 20.0 MW solar interconnection project in Lake, Oregon with a current status of withdrawn. It is proposed to connect at To BPA's Transmission Facilities through the 115 kV facilities of Midstate Electric Cooperative. Midstate Electric Coop 115 kV line.

20.0 MWCapacity
WithdrawnStatus
ORMarket
SolarTechnology

Project facts

Canonical nameOR Queue Project G0416 — Solar in Lake, Oregon
Queue IDG0416
Statuswithdrawn
Source statusWITHDRAWN
MarketOR
TechnologySolar
Capacity20.0 MW
StateOregon
CountyLake
Point of interconnectionTo BPA's Transmission Facilities through the 115 kV facilities of Midstate Electric Cooperative. Midstate Electric Coop 115 kV line
Requested (queue) date2010-03-23
Proposed in-service date2012-09-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata