OR Queue Project G0438 — Wind in Polk And Lincoln, Oregon

OR Queue Project G0438 — Wind in Polk And Lincoln, Oregon is a 125.0 MW wind interconnection project in Polk And Lincoln, Oregon with a current status of withdrawn. It is proposed to connect at On BPA's Salem-Grande Ronde-Tillamook line east of PGE's Grande Ronde Substation..

125.0 MWCapacity
WithdrawnStatus
ORMarket
WindTechnology

Project facts

Canonical nameOR Queue Project G0438 — Wind in Polk And Lincoln, Oregon
Queue IDG0438
Statuswithdrawn
Source statusWITHDRAWN
MarketOR
TechnologyWind
Capacity125.0 MW
StateOregon
CountyPolk And Lincoln
Point of interconnectionOn BPA's Salem-Grande Ronde-Tillamook line east of PGE's Grande Ronde Substation.
Requested (queue) date2010-10-15
Proposed in-service date2013-10-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata