OR Queue Project G0643 — Battery in Crook, Oregon
OR Queue Project G0643 — Battery in Crook, Oregon is a 600.0 MW battery interconnection project in Crook, Oregon with a current status of active. It is proposed to connect at Ponderosa 230 kV.
600.0 MWCapacity
ActiveStatus
ORMarket
BatteryTechnology
Project facts
| Canonical name | OR Queue Project G0643 — Battery in Crook, Oregon |
|---|---|
| Queue ID | G0643 |
| Status | active |
| Source status | STUDY |
| Market | OR |
| Technology | Battery |
| Capacity | 600.0 MW |
| State | Oregon |
| County | Crook |
| Point of interconnection | Ponderosa 230 kV |
| Requested (queue) date | 2020-02-24 |
| Proposed in-service date | 2024-06-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Bonneville Power Administration |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata