OR Queue Project G0653 — Wind in Clatsop, Oregon
OR Queue Project G0653 — Wind in Clatsop, Oregon is a 117.0 MW wind interconnection project in Clatsop, Oregon with a current status of withdrawn. It is proposed to connect at A new 230 kV interconnection point onto BPA's existing 230 kV Allston - Clatsop transmission line at BPA pole #7102-23-1 or a new 230 kV interconnection point onto BPA's existing 230 kV system at BPA's Driscoll substation..
Project facts
| Canonical name | OR Queue Project G0653 — Wind in Clatsop, Oregon |
|---|---|
| Queue ID | G0653 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | OR |
| Technology | Wind |
| Capacity | 117.0 MW |
| State | Oregon |
| County | Clatsop |
| Point of interconnection | A new 230 kV interconnection point onto BPA's existing 230 kV Allston - Clatsop transmission line at BPA pole #7102-23-1 or a new 230 kV interconnection point onto BPA's existing 230 kV system at BPA's Driscoll substation. |
| Requested (queue) date | 2020-07-10 |
| Proposed in-service date | 2024-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Bonneville Power Administration |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.