OR Queue Project G0653 — Wind in Clatsop, Oregon

OR Queue Project G0653 — Wind in Clatsop, Oregon is a 117.0 MW wind interconnection project in Clatsop, Oregon with a current status of withdrawn. It is proposed to connect at A new 230 kV interconnection point onto BPA's existing 230 kV Allston - Clatsop transmission line at BPA pole #7102-23-1 or a new 230 kV interconnection point onto BPA's existing 230 kV system at BPA's Driscoll substation..

117.0 MWCapacity
WithdrawnStatus
ORMarket
WindTechnology

Project facts

Canonical nameOR Queue Project G0653 — Wind in Clatsop, Oregon
Queue IDG0653
Statuswithdrawn
Source statusWITHDRAWN
MarketOR
TechnologyWind
Capacity117.0 MW
StateOregon
CountyClatsop
Point of interconnectionA new 230 kV interconnection point onto BPA's existing 230 kV Allston - Clatsop transmission line at BPA pole #7102-23-1 or a new 230 kV interconnection point onto BPA's existing 230 kV system at BPA's Driscoll substation.
Requested (queue) date2020-07-10
Proposed in-service date2024-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata