OR Queue Project G0662 — Solar in Deschutes, Oregon

OR Queue Project G0662 — Solar in Deschutes, Oregon is a 400.0 MW solar interconnection project in Deschutes, Oregon with a current status of withdrawn. It is proposed to connect at Pilot Butte to Redmond 230kV or Pilot Butte to Ponderosa 230kV.

400.0 MWCapacity
WithdrawnStatus
ORMarket
SolarTechnology

Project facts

Canonical nameOR Queue Project G0662 — Solar in Deschutes, Oregon
Queue IDG0662
Statuswithdrawn
Source statusWITHDRAWN
MarketOR
TechnologySolar
Capacity400.0 MW
StateOregon
CountyDeschutes
Point of interconnectionPilot Butte to Redmond 230kV or Pilot Butte to Ponderosa 230kV
Requested (queue) date2020-12-21
Proposed in-service date2025-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.