OR Queue Project G0728 — Wind in Sherman, Oregon
OR Queue Project G0728 — Wind in Sherman, Oregon is a 210.0 MW wind interconnection project in Sherman, Oregon with a current status of withdrawn. It is proposed to connect at Jones Canyon to Tumble Creek section of Jones Canyon-Santiam No 1 230 kV line; Ashe to Marian No 2 500 kV line; or Slatt to Buckley No 1 500 kV line..
Project facts
| Canonical name | OR Queue Project G0728 — Wind in Sherman, Oregon |
|---|---|
| Queue ID | G0728 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | OR |
| Technology | Wind |
| Capacity | 210.0 MW |
| State | Oregon |
| County | Sherman |
| Point of interconnection | Jones Canyon to Tumble Creek section of Jones Canyon-Santiam No 1 230 kV line; Ashe to Marian No 2 500 kV line; or Slatt to Buckley No 1 500 kV line. |
| Requested (queue) date | 2022-02-04 |
| Proposed in-service date | 2026-12-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Bonneville Power Administration |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata