OR Queue Project G0752 — Battery in Morrow, Oregon

OR Queue Project G0752 — Battery in Morrow, Oregon is a 340.0 MW battery interconnection project in Morrow, Oregon with a current status of active. It is proposed to connect at 5-mile 500kV Gen Tie to Longhorn 500 kV Substation.

340.0 MWCapacity
ActiveStatus
ORMarket
BatteryTechnology

Project facts

Canonical nameOR Queue Project G0752 — Battery in Morrow, Oregon
Queue IDG0752
Statusactive
Source statusSTUDY
MarketOR
TechnologyBattery
Capacity340.0 MW
StateOregon
CountyMorrow
Point of interconnection5-mile 500kV Gen Tie to Longhorn 500 kV Substation
Requested (queue) date2022-06-15
Proposed in-service date2025-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata