OR Queue Project G0787 — Battery in Wasco, Oregon

OR Queue Project G0787 — Battery in Wasco, Oregon is a 600.0 MW battery interconnection project in Wasco, Oregon with a current status of active. It is proposed to connect at Big Eddy-Ostrander No 1 500 kV.

600.0 MWCapacity
ActiveStatus
ORMarket
BatteryTechnology

Project facts

Canonical nameOR Queue Project G0787 — Battery in Wasco, Oregon
Queue IDG0787
Statusactive
Source statusSTUDY
MarketOR
TechnologyBattery
Capacity600.0 MW
StateOregon
CountyWasco
Point of interconnectionBig Eddy-Ostrander No 1 500 kV
Requested (queue) date2022-08-17
Proposed in-service date2028-12-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—activehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-11-26

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.