OR Queue Project G0789 — Solar in Wasco, Oregon

OR Queue Project G0789 — Solar in Wasco, Oregon is a 200.0 MW solar interconnection project in Wasco, Oregon with a current status of withdrawn. It is proposed to connect at BPA 230KV Big Eddy-Redmond transmission line..

200.0 MWCapacity
WithdrawnStatus
ORMarket
SolarTechnology

Project facts

Canonical nameOR Queue Project G0789 — Solar in Wasco, Oregon
Queue IDG0789
Statuswithdrawn
Source statusWITHDRAWN
MarketOR
TechnologySolar
Capacity200.0 MW
StateOregon
CountyWasco
Point of interconnectionBPA 230KV Big Eddy-Redmond transmission line.
Requested (queue) date2022-08-18
Proposed in-service date2028-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata