OR Queue Project G0818 — Solar in Wasco, Oregon

OR Queue Project G0818 — Solar in Wasco, Oregon is a 3.0 MW solar interconnection project in Wasco, Oregon with a current status of withdrawn. It is proposed to connect at Maupin-Tygh Valley #1 69 kV line.

3.0 MWCapacity
WithdrawnStatus
ORMarket
SolarTechnology

Project facts

Canonical nameOR Queue Project G0818 — Solar in Wasco, Oregon
Queue IDG0818
Statuswithdrawn
Source statusWITHDRAWN
MarketOR
TechnologySolar
Capacity3.0 MW
StateOregon
CountyWasco
Point of interconnectionMaupin-Tygh Valley #1 69 kV line
Requested (queue) date2022-10-20
Proposed in-service date2025-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata