OR Queue Project G0866 — Solar in Sherman, Oregon
OR Queue Project G0866 — Solar in Sherman, Oregon is a 300.0 MW solar interconnection project in Sherman, Oregon with a current status of active. It is proposed to connect at Buckley Substation.
300.0 MWCapacity
ActiveStatus
ORMarket
SolarTechnology
Project facts
| Canonical name | OR Queue Project G0866 — Solar in Sherman, Oregon |
|---|---|
| Queue ID | G0866 |
| Status | active |
| Source status | STUDY |
| Market | OR |
| Technology | Solar |
| Capacity | 300.0 MW |
| State | Oregon |
| County | Sherman |
| Point of interconnection | Buckley Substation |
| Requested (queue) date | 2023-06-02 |
| Proposed in-service date | 2027-09-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Bonneville Power Administration |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.