OR Queue Project G0892 — Battery in Linn, Oregon

OR Queue Project G0892 — Battery in Linn, Oregon is a 200.0 MW battery interconnection project in Linn, Oregon with a current status of active. It is proposed to connect at Santiam 230kV Substation.

200.0 MWCapacity
ActiveStatus
ORMarket
BatteryTechnology

Project facts

Canonical nameOR Queue Project G0892 — Battery in Linn, Oregon
Queue IDG0892
Statusactive
Source statusSTUDY
MarketOR
TechnologyBattery
Capacity200.0 MW
StateOregon
CountyLinn
Point of interconnectionSantiam 230kV Substation
Requested (queue) date2023-06-30
Proposed in-service date2030-12-02
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata