OR Queue Project G0918 — Wind in Lane, Oregon
OR Queue Project G0918 — Wind in Lane, Oregon is a 300.0 MW wind interconnection project in Lane, Oregon with a current status of withdrawn. It is proposed to connect at Santiam-Alvey 1&2 No 1 230kV line.
300.0 MWCapacity
WithdrawnStatus
ORMarket
WindTechnology
Project facts
| Canonical name | OR Queue Project G0918 — Wind in Lane, Oregon |
|---|---|
| Queue ID | G0918 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | OR |
| Technology | Wind |
| Capacity | 300.0 MW |
| State | Oregon |
| County | Lane |
| Point of interconnection | Santiam-Alvey 1&2 No 1 230kV line |
| Requested (queue) date | 2023-08-24 |
| Proposed in-service date | 2029-10-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Bonneville Power Administration |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata