OR Queue Project G0958 — Wind in Wasco, Oregon

OR Queue Project G0958 — Wind in Wasco, Oregon is a 400.0 MW wind interconnection project in Wasco, Oregon with a current status of withdrawn. It is proposed to connect at John Day - Marion No 1 500kV line.

400.0 MWCapacity
WithdrawnStatus
ORMarket
WindTechnology

Project facts

Canonical nameOR Queue Project G0958 — Wind in Wasco, Oregon
Queue IDG0958
Statuswithdrawn
Source statusWITHDRAWN
MarketOR
TechnologyWind
Capacity400.0 MW
StateOregon
CountyWasco
Point of interconnectionJohn Day - Marion No 1 500kV line
Requested (queue) date2023-10-06
Proposed in-service date2027-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata