OR Queue Project G0960 — Solar in Morrow, Oregon

OR Queue Project G0960 — Solar in Morrow, Oregon is a 650.0 MW solar interconnection project in Morrow, Oregon with a current status of withdrawn. It is proposed to connect at Longhorn Substation at 230 kV.

650.0 MWCapacity
WithdrawnStatus
ORMarket
SolarTechnology

Project facts

Canonical nameOR Queue Project G0960 — Solar in Morrow, Oregon
Queue IDG0960
Statuswithdrawn
Source statusWITHDRAWN
MarketOR
TechnologySolar
Capacity650.0 MW
StateOregon
CountyMorrow
Point of interconnectionLonghorn Substation at 230 kV
Requested (queue) date2023-10-11
Proposed in-service date2026-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata