Project facts

Canonical nameOR Queue Project G0965 — Battery in Umatilla, Oregon
Queue IDG0965
Statusactive
Source statusSTUDY
MarketOR
TechnologyBattery
Capacity650.0 MW
StateOregon
CountyUmatilla
Point of interconnectionStanfield Substation at 230 kV
Requested (queue) date2023-10-11
Proposed in-service date2032-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata