OR Queue Project G1000 — Solar in Morrow, Oregon is a 440.0 MW solar interconnection project in Morrow, Oregon with a current status of withdrawn. It is proposed to connect at McNary Substation, or Longhorn Substation.

440.0 MWCapacity
WithdrawnStatus
ORMarket
SolarTechnology

Project facts

Canonical nameOR Queue Project G1000 — Solar in Morrow, Oregon
Queue IDG1000
Statuswithdrawn
Source statusWITHDRAWN
MarketOR
TechnologySolar
Capacity440.0 MW
StateOregon
CountyMorrow
Point of interconnectionMcNary Substation, or Longhorn Substation
Requested (queue) date2023-11-15
Proposed in-service date2029-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata