OR Queue Project G1013 — Wind in Umatilla, Oregon

OR Queue Project G1013 — Wind in Umatilla, Oregon is a 250.1 MW wind interconnection project in Umatilla, Oregon with a current status of withdrawn. It is proposed to connect at Combine Hills II tap to Walla Walla-Pendleton No 1 69 kV line.

250.1 MWCapacity
WithdrawnStatus
ORMarket
WindTechnology

Project facts

Canonical nameOR Queue Project G1013 — Wind in Umatilla, Oregon
Queue IDG1013
Statuswithdrawn
Source statusWITHDRAWN
MarketOR
TechnologyWind
Capacity250.1 MW
StateOregon
CountyUmatilla
Point of interconnectionCombine Hills II tap to Walla Walla-Pendleton No 1 69 kV line
Requested (queue) date2023-11-20
Proposed in-service date2030-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.