OR Queue Project G1064 — Battery in Umatilla, Oregon
OR Queue Project G1064 — Battery in Umatilla, Oregon is a 15.0 MW battery interconnection project in Umatilla, Oregon with a current status of withdrawn. It is proposed to connect at UEC Westland to McNary 230 kV line that terminates in the 230 kV Bay 16 terminal of the McNary Substation..
15.0 MWCapacity
WithdrawnStatus
ORMarket
BatteryTechnology
Project facts
| Canonical name | OR Queue Project G1064 — Battery in Umatilla, Oregon |
|---|---|
| Queue ID | G1064 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | OR |
| Technology | Battery |
| Capacity | 15.0 MW |
| State | Oregon |
| County | Umatilla |
| Point of interconnection | UEC Westland to McNary 230 kV line that terminates in the 230 kV Bay 16 terminal of the McNary Substation. |
| Requested (queue) date | 2024-04-16 |
| Proposed in-service date | 2026-01-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Bonneville Power Administration |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata