OR Queue Project G1088 — Battery in Umatilla, Oregon
OR Queue Project G1088 — Battery in Umatilla, Oregon is a 300.0 MW battery interconnection project in Umatilla, Oregon with a current status of active. It is proposed to connect at Primary POI: 115kV Buttercreek Substation (GPS: 45.726928, -119.351397) Secondary POI: 115kV Feedville Substation (GPS: 45.806233, -119.264708).
300.0 MWCapacity
ActiveStatus
ORMarket
BatteryTechnology
Project facts
| Canonical name | OR Queue Project G1088 — Battery in Umatilla, Oregon |
|---|---|
| Queue ID | G1088 |
| Status | active |
| Source status | RECEIVED |
| Market | OR |
| Technology | Battery |
| Capacity | 300.0 MW |
| State | Oregon |
| County | Umatilla |
| Point of interconnection | Primary POI: 115kV Buttercreek Substation (GPS: 45.726928, -119.351397) Secondary POI: 115kV Feedville Substation (GPS: 45.806233, -119.264708) |
| Requested (queue) date | 2025-12-18 |
| Proposed in-service date | 2031-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata