OR Queue Project G1088 — Battery in Umatilla, Oregon

OR Queue Project G1088 — Battery in Umatilla, Oregon is a 300.0 MW battery interconnection project in Umatilla, Oregon with a current status of active. It is proposed to connect at Primary POI: 115kV Buttercreek Substation (GPS: 45.726928, -119.351397) Secondary POI: 115kV Feedville Substation (GPS: 45.806233, -119.264708).

300.0 MWCapacity
ActiveStatus
ORMarket
BatteryTechnology

Project facts

Canonical nameOR Queue Project G1088 — Battery in Umatilla, Oregon
Queue IDG1088
Statusactive
Source statusRECEIVED
MarketOR
TechnologyBattery
Capacity300.0 MW
StateOregon
CountyUmatilla
Point of interconnectionPrimary POI: 115kV Buttercreek Substation (GPS: 45.726928, -119.351397) Secondary POI: 115kV Feedville Substation (GPS: 45.806233, -119.264708)
Requested (queue) date2025-12-18
Proposed in-service date2031-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.