OR Queue Project G1093 — Solar in Deschutes, Oregon

OR Queue Project G1093 — Solar in Deschutes, Oregon is a 1.0 MW solar interconnection project in Deschutes, Oregon with a current status of active. It is proposed to connect at Ponderosa-Pilot Butte No 1 230 kV line.

1.0 MWCapacity
ActiveStatus
ORMarket
SolarTechnology

Project facts

Canonical nameOR Queue Project G1093 — Solar in Deschutes, Oregon
Queue IDG1093
Statusactive
Source statusSTUDY
MarketOR
TechnologySolar
Capacity1.0 MW
StateOregon
CountyDeschutes
Point of interconnectionPonderosa-Pilot Butte No 1 230 kV line
Requested (queue) date2026-02-19
Proposed in-service date2026-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata