OR Queue Project OCS001 — Solar in Crook, Oregon

OR Queue Project OCS001 — Solar in Crook, Oregon is a 1.5 MW solar interconnection project in Crook, Oregon with a current status of withdrawn. It is proposed to connect at Circuit 5D69 out of Prineville substation.

1.5 MWCapacity
WithdrawnStatus
ORMarket
SolarTechnology

Project facts

Canonical nameOR Queue Project OCS001 — Solar in Crook, Oregon
Queue IDOCS001
Statuswithdrawn
Source statusWithdrawn
MarketOR
TechnologySolar
Capacity1.5 MW
StateOregon
CountyCrook
Point of interconnectionCircuit 5D69 out of Prineville substation
Requested (queue) date2020-02-06
Proposed in-service date2020-11-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata