OR Queue Project OCS008 — Solar in Linn, Oregon
OR Queue Project OCS008 — Solar in Linn, Oregon is a 2.1 MW solar interconnection project in Linn, Oregon with a current status of operational. It is proposed to connect at Circuit 4M17 out of Brownsville substation.
2.1 MWCapacity
OperationalStatus
ORMarket
SolarTechnology
Project facts
| Canonical name | OR Queue Project OCS008 — Solar in Linn, Oregon |
|---|---|
| Queue ID | OCS008 |
| Status | operational |
| Source status | In Service |
| Market | OR |
| Technology | Solar |
| Capacity | 2.1 MW |
| State | Oregon |
| County | Linn |
| Point of interconnection | Circuit 4M17 out of Brownsville substation |
| Requested (queue) date | 2020-02-14 |
| Proposed in-service date | — |
| Operational date | 2024-09-06 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | PacifiCorp |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.