OR Queue Project OCS026 — Solar in Linn, Oregon

OR Queue Project OCS026 — Solar in Linn, Oregon is a 1.5 MW solar interconnection project in Linn, Oregon with a current status of withdrawn. It is proposed to connect at Circuit 4M120 out of New Lyons substation.

1.5 MWCapacity
WithdrawnStatus
ORMarket
SolarTechnology

Project facts

Canonical nameOR Queue Project OCS026 — Solar in Linn, Oregon
Queue IDOCS026
Statuswithdrawn
Source statusWithdrawn
MarketOR
TechnologySolar
Capacity1.5 MW
StateOregon
CountyLinn
Point of interconnectionCircuit 4M120 out of New Lyons substation
Requested (queue) date2020-04-30
Proposed in-service date2022-03-03
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata