OR Queue Project OCS048 — Solar in Jackson, Oregon
OR Queue Project OCS048 — Solar in Jackson, Oregon is a 1.4 MW solar interconnection project in Jackson, Oregon with a current status of withdrawn. It is proposed to connect at Circuit 5R76 out of White City substation.
1.4 MWCapacity
WithdrawnStatus
ORMarket
SolarTechnology
Project facts
| Canonical name | OR Queue Project OCS048 — Solar in Jackson, Oregon |
|---|---|
| Queue ID | OCS048 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | OR |
| Technology | Solar |
| Capacity | 1.4 MW |
| State | Oregon |
| County | Jackson |
| Point of interconnection | Circuit 5R76 out of White City substation |
| Requested (queue) date | 2020-10-22 |
| Proposed in-service date | 2024-11-19 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | PacifiCorp |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata