OR Queue Project OCS048 — Solar in Jackson, Oregon

OR Queue Project OCS048 — Solar in Jackson, Oregon is a 1.4 MW solar interconnection project in Jackson, Oregon with a current status of withdrawn. It is proposed to connect at Circuit 5R76 out of White City substation.

1.4 MWCapacity
WithdrawnStatus
ORMarket
SolarTechnology

Project facts

Canonical nameOR Queue Project OCS048 — Solar in Jackson, Oregon
Queue IDOCS048
Statuswithdrawn
Source statusWithdrawn
MarketOR
TechnologySolar
Capacity1.4 MW
StateOregon
CountyJackson
Point of interconnectionCircuit 5R76 out of White City substation
Requested (queue) date2020-10-22
Proposed in-service date2024-11-19
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerPacifiCorp

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—withdrawnhigh

Explore related data

Source last checked2026-10-05
Data last materially changed2026-10-05
Page data generated2026-10-11

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.