OR Queue Project OCS068 — Solar in Douglas, Oregon
OR Queue Project OCS068 — Solar in Douglas, Oregon is a 1.0 MW solar interconnection project in Douglas, Oregon with a current status of withdrawn. It is proposed to connect at Circuit 5U35 out of Sutherlin substation.
1.0 MWCapacity
WithdrawnStatus
ORMarket
SolarTechnology
Project facts
| Canonical name | OR Queue Project OCS068 — Solar in Douglas, Oregon |
|---|---|
| Queue ID | OCS068 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | OR |
| Technology | Solar |
| Capacity | 1.0 MW |
| State | Oregon |
| County | Douglas |
| Point of interconnection | Circuit 5U35 out of Sutherlin substation |
| Requested (queue) date | 2021-01-27 |
| Proposed in-service date | 2024-03-03 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | PacifiCorp |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata